Different from the conventional pipeline liquefaction, the associated gas, wellhead gas, shale gas, coalbed methane and tight gas in remote oil fields have the characteristics of small, scattered, remote and unstable gas sources, so the traditional pipeline laying method is featured with high investment and high risk, which will lead to environmental pollution and waste of resources if recovery is not implemented; moreover, the sales coverage is small if CNG products are produced. In view of the above situation, our company has developed a kind of high-efficiency, low-cost, and movable small-scale natural gas liquefaction recovery equipment – MiniLNG complete set, which can conveniently recover small and scattered gas sources, improving the energy utilization efficiency and facilitating installation and relocation..
Safe and reliable. All the equipment is designed and manufactured according to international and domestic standards..
Mature technology. Six sets of similar systems have been completed, thus a lot of successful manufacturing and operation experiences are accumulated, having received high reputations from users.
Advanced process. The self-developed advanced MRC (Mixed Refrigerant Cycle) process is used, which is characterized with low operating cost.
High quality. All the equipment is produced in batches in professional factory production lines, and the pressure test, purging and inspection are carried out in the factory, which not only ensures the quality, but also reduces the production cost.
Good service. Turnkey project, providing a complete set of personalized design, manufacturing, installation, debugging, training and lifelong technical services.
Complete function. The functions of natural gas purification, liquefaction, separation, storage and transportation are provided.
Strong adaptability. The scale, type and quantity of equipment can be combined and customized according to the actual gas source, environmental conditions and customers’ needs.
Strong flexibility. The whole set of equipment can be moved at any time.
The on-site construction period is short. There is little on-site construction, and there is basically no need for large concrete foundation. 10. Small area covered. High integration.